Associate Structural Engineering design services for the renovation(s) and additions to the existing terminal at the Nashville International Airport.

Renovations include addition of new ticket lobby floor space-composite steel framed floors, new standalone structure for new restrooms.

Concourse A–composite steel framed structure supported on drilled piers and steel framed roof; renovation of several existing restrooms-structural modifications to floor and roof, new skylight installation modifications to entry and exit pathways, support for new signage, restaurant and bank. 

Total construction cost for the two projects is around 60.0 million.