Infrastructure

Waste Water Treatment Plant, Muscle Shoals, AL

LPE’s role

The Waste Water Treatment Plant upgrade for this project included a single story storage facility with monorail, a sludge drying bed concrete facility, a 4000 gallon oil storage facility and a 10 foot tall retention pond wall with walkway.